Diablo Resources (ASX:DBO) is planning maiden drilling at the Horn Silver Project in Utah, US, in early 2027 after sampling returned silver up to 1,580 grams per tonne.
The company collected 65 reconnaissance rock samples across patented claims. Dump material at the historical Horn Silver Mine returned 1,495g/t silver (Ag), 0.41g/t gold (Au), and 0.47% antimony (Sb), an association not previously recognised at the project.
The mine produced 17 million ounces of silver at 604g/t, and the mineralised structure remains open along strike and at depth.
At the Gossan Prospect, samples returned 1,580g/t Ag, 0.44g/t Au, and 0.11% Sb, alongside 826g/t Ag and 464g/t Ag.
The interpreted structure extends about 400m and sits near an induced polarisation anomaly that the company is reprocessing to refine drill targets.
The Drum Prospect returned up to 509g/t Ag and 1.79g/t Au, plus 363g/t Ag with 3.9g/t Ag, along a fissure traceable for more than 300m. At St Louis, three of 11 samples returned up to 30% zinc and 15.15% lead.
The samples are grab samples, which target visibly mineralised rock and do not represent average grades.
Diablo will integrate the results into regional target ranking, complete follow-up mapping and sampling on priority silver-antimony targets, and finalise permitting and drill planning.
It is also assessing whether the historical underground workings at Horn can be safely accessed for mapping and channel sampling.
CEO Lyle Thorne, who spent the past two weeks on site, says the results expand the project’s polymetallic footprint.
“We have now established a growing pipeline of high-priority drill targets across several prospective mineralised structures,” Thorne notes.
Diablo Resources holds an 80% interest in Horn, which comprises 101 patented and 101 unpatented claims in the Frisco Mining District, about 20km west of Milford. Its Star Range Project lies about 15km away.
Write to JC Villarba at Mining.com.au
Images: Diablo Resources



