Gold above. Gold below. Irvine is giving Aureka plenty to chase.
Aureka (ASX:AKA) Managing Director James Gurry joins Mining.com.au after drilling at the flagship Irvine Gold Project in Victoria delivered both a new shallow mineralised structure and abundant visible gold deeper in the system.
Key topics discussed:
- New shallow structure: RD060 hit 5.45m at nearly 3 grams per tonne gold (Au), including a higher-grade section, outside the current inferred resource
- Visible gold at depth: A deeper wedge hole intersected multiple instances of visible gold around 450–460m downhole
- Near a record hit: The visible gold sits about 50m north of RD048, which previously returned 10m @ 12.1g/t Au
- Room to grow: Irvine currently hosts a 398,300-ounce inferred gold resource, with drilling continuing across exploration target areas
- Assays next: Results from the visible-gold interval are expected in the coming weeks
About the guest and company:
James Gurry is the managing director of Aureka, an integrated Victorian gold producer and explorer. Aureka operates the Fiddlers Creek gold mine and Wedderburn mill while advancing Irvine on the Stawell Corridor and Comstock at St Arnaud.
New shallow gold. Visible gold deeper down. Now the lab gets to talk.
Disclosure: Mining.com.au may hold shares in Aureka. Aureka changed its name from Navarre Minerals in December 2024.







