Many Peaks Minerals (ASX:MPK) has expanded gold mineralisation from an ongoing extension and delineation drilling campaign at the Ferké Gold Project in Côte d’Ivoire, returning assay from a further eight diamond core drillholes over 2,415m.
The company says recently returned assays increase confidence in the interim Ouarigue resource estimate.
Significant intercepts include 106.7m @ 2.52 grams per tonne gold from 154.75m, including 17.95m @ 8.21g/t gold; 95m @ 2.28g/t gold from 253m, including 8m @ 9.29g/t gold and 8.6m @ 8.83g/t gold; and 81.32m @ 2.69g/t gold from 28.2m, including 2.8m @ 11.1g/t gold and 18m @ 4.67g/t gold.
Many Peaks has two diamond drill rigs continuing to operate at Ferké, along with a reverse circulation drill mobilised for regional exploration drilling in the coming week.
Managing Director Travis Schwertfeger says the results validate the “robustness and potential” of the maiden resource estimate for the Ouarigue prospect.
“The pervasiveness of impressive gold grades within the mineralised intrusion increases confidence in both geological continuity and future mine planning assumptions,” Schwertfeger says.
“This program supports resource classification upgrades while also highlighting further growth potential beyond the current resource boundaries, anticipated to further add to average ounces of gold per vertical metre with FNDC101 reporting 106.7m @ 2.52g/t gold from 154.75m, incl. 17.95m @ 8.21g/t gold.”
As reported by Mining.com.au, the company unveiled a maiden estimate for the Ouarigue prospect earlier this month, returning 26.7 million tonnes @ 1.54 grams per tonne gold for 1.32 million ounces.
The resource includes 23.1 million tonnes @ 1.47g/t gold in the measured and indicated category, as well as 3.5 million tonnes @ 2g/t gold in the inferred category.
Many Peaks Minerals is a gold and copper explorer focused on its portfolio of projects in West Africa.
Write to Maddison Elliott at Mining.com.au
Images: Many Peaks Minerals



