E-Power Resources (CSE:EPR) has started its 2025 exploration campaign at the Tetepisca Flake Graphite Project in Québec, Canada.
Phase one will focus on the highest priority target area on the project, Graphi-Centre, where prospecting and sampling last year resulted in several graphite discoveries.
E-Power intends to conduct geological mapping and sampling to evaluate and delineate the distribution of potentially favourable styles of mineralisation.
At the northern claims, geophysical prospecting, geological mapping and outcrop sampling will be carried out to follow-up on the discoveries made in 2024. The company aims to determine dimensions and orientations of potential flake graphite zones.
Further, a total of one tonne of flake graphite mineralisation will be collected in four samples. Three samples will be collected from the Graphi-Centre target and one from the northern claims.

Upon completion, the samples will be submitted to SGS Canada, Lakefield, for metallurgical testwork.
CEO James Cross says the 2025 exploration program will continue to evaluate the company’s large land position in the Tetepisca graphite district.
“The discoveries made on the northern claim group during 2024 expand the scope of our evaluation of the property for high-grade, high-quality and from-surface flake graphite deposits,” Cross says.
“The results of metallurgical testwork on samples collected in 2024 from advanced targets in the southern claims are pending and expected soon. We look forward to compiling those results, planning and executing our phase two 2025 program.”
The Tetepisca Project, covering 12,620 hectares, sits within the Tetepisca graphite district in the North Shore region of Québec, Canada.
E-Power Resources is a mineral explorer based in Montreal, focusing on battery mineral discoveries in Québec.
Graphite is one of the current demand drivers in the electric vehicle industry. Graphite forms the anode portion of an EV battery. North America has only one producing graphite mine and it contributes less than 1% of global graphite supply.
As Mining.com.au reported last week, the International Energy Agency (IEA) forecasts clean energy demand will account for about 54% of graphite demand by 2030.
The global graphite market is poised to grow from US$8.32 billion in 2025 to US$13.35 billion ($20.53 billion) by 2032 at a compound annual growth rate of 6.9%. In 2024, natural graphite production was roughly 1.3 million tonnes, with synthetic graphite production more than double at 3 million tonnes.
Benchmark Mineral Intelligence predicts natural graphite demand will increase 140% by 2030, meaning the market will need about 1.7 million tonnes of the material. That means about 30 new natural graphite mines and 12 new synthetic graphite plants will need to come online globally to fill the void.
Write to Aaliyah Rogan at Mining.com.au
Images: E-Power Resources



