MDF Global MDF Global
Apple’s iPhone boom highlights critical minerals powering smartphones•Presenting a united front for Queensland’s copper sector•Thailand seeks Myanmar mine access amid arsenic pollution•Egypt to set up state-backed company to license artisanal gold miners, free detainees•Brixton closes $7.4 million raise for Thorn, Langis projects•Heliostar banks record $78.7 million for Ana Paula push•Mining giants bet billions on 2030 supply crunch•Gunnison Copper reports Q3 output, revenue surge•Triumph Gold targets $15.46 million for Yukon push•African Rainbow Minerals faces a jobs dispute at Nkomati mine•Angola seeks 10% stake in De Beers under Anglo’s proposed exit•Gold price rebounds but heads for biggest weekly loss since June•Teck copper strike reaches BC port as operator sues union•Copper benchmark rocked by miner-smelter tug-of-war•Zimbabwe mining bill targets community, environmental safeguards•Mount Isa critical minerals hub secures Feasibility Study funding•Eramet initiates $814.5 million capital raise to reduce debt•Richemont backs natural gemstones, declines De Beers comment•‘Tis the season for administration as Comlek falls a second time•OceanaGold Philippines trials wireless blasting at Didipio mine Apple’s iPhone boom highlights critical minerals powering smartphones•Presenting a united front for Queensland’s copper sector•Thailand seeks Myanmar mine access amid arsenic pollution•Egypt to set up state-backed company to license artisanal gold miners, free detainees•Brixton closes $7.4 million raise for Thorn, Langis projects•Heliostar banks record $78.7 million for Ana Paula push•Mining giants bet billions on 2030 supply crunch•Gunnison Copper reports Q3 output, revenue surge•Triumph Gold targets $15.46 million for Yukon push•African Rainbow Minerals faces a jobs dispute at Nkomati mine•Angola seeks 10% stake in De Beers under Anglo’s proposed exit•Gold price rebounds but heads for biggest weekly loss since June•Teck copper strike reaches BC port as operator sues union•Copper benchmark rocked by miner-smelter tug-of-war•Zimbabwe mining bill targets community, environmental safeguards•Mount Isa critical minerals hub secures Feasibility Study funding•Eramet initiates $814.5 million capital raise to reduce debt•Richemont backs natural gemstones, declines De Beers comment•‘Tis the season for administration as Comlek falls a second time•OceanaGold Philippines trials wireless blasting at Didipio mine
Belararox

Belararox confirms massive sulphides at Belara project from phase one RC drilling

Belararox (ASX:BRX) has reported massive sulphide mineralisation from Phase One RC resource drilling at its Belara Project in New South Wales.

Two holes from the program (BLRC009 and BLRC011), which was carried out on previously un-drilled areas, confirmed continuity of the grade and width of mineralisation in accordance with historical resource model interpretations, with key results over 1% zinc equivalent including:

  • Hole BLRC011:
    • 17.0m @ 3.25% Zn equivalent from 81.0m (0.94% Zn, 0.52% Cu, 0.27% Pb, 10.79 g/t Ag and 0.21 g/t Au); inc.
      • 3.0m @ 10.21 % Zn equivalent from 81.0m (3.84% Zn, 1.15% Cu, 1.10% Pb, 43.87 g/t Ag and 0.77 g/t Au)
  • Hole BLRC009:
    • 3.0 m @ 7.82% Zn equivalent from 101.0m (0.73% Zn, 2.02% Cu, 0.21% Pb, 18.27 g/t Ag and 0.39 g/t Au)
    • 1.0m @ 1.68% Zn equivalent from 108.0m (0.63% Zn, 0.28% Cu, 0.08% Pb, 2.90 g/t Ag and 0.06 g/t Au).

Addressing the results, Belararox Managing Director Arvind Misra said: “We are delighted with the first assay results from our Phase One drilling program, which confirm massive sulphide mineralisation at Belara.

“We are delighted with the first assay results from our Phase One drilling program”

Today’s results are important, even at this early stage, as they represent another significant step forward in building a significant resource at the Belara project and provide more confidence in the continuity of the grade and width of massive sulphide mineralisation in undrilled areas.

We will continue to update shareholders with assay results over the coming weeks as our team works to rapidly deliver a Mineral Resource Estimate in early H2 2022.”

The company notes that mineralisation encountered in hole BLRC009 delivered comparable combined metal content to the interpretation provided by the project’s historic resource model.

Further results from hole BLRC011 proved to be wider, with similar zinc equivalent grades to the historic resource model. This ultimately delivered twice the volume of combined metal content.

Section displaying hole BLRC009 in relation to historic hole B030, with interpreted geology and interpreted massive sulphide mineralisation
Section displaying hole BLRC009 in relation to historic hole B030, with interpreted geology and interpreted massive sulphide mineralisation

Data also shows that the holes are surrounded by disseminated pyrite and pyrrhotite, providing additional confirmation that exploration targets generated from geophysical data may deliver similar mineralisation to the Belara mine area.

Moving forward, Belararox reports that it expects to begin announcing results from 1,551 pending assays over the coming six weeks, with 16 RC holes totalling 3,084m remaining to be drilled by July.

In addition, resource estimation studies are also expected to commence July.

Images: Belararox Ltd
Add to Watch List:
Written By Jonathan Norris
Jonathan is a founder of Mining.com.au and has been covering the resources industry since 2018. With over 17 years experience in print, broadcast and online media, Jonathan has seen first hand the transformative effect of online niche media.