“We basically went further west and much shallower and bingo … a couple monster holes, so super stoked about that!”
Power Nickel (TSX-V:PNPN) CEO Terry Lynch tells Mining.com.au’s Shae Russell how with a bit of re-targeting ‘boom!’ Power Nickel found the primary zone within the Nisk Project.
Find out about this and more as Lynch details a “very heavy core, full of metal, a ‘monster hole’.”
“Five metres of 5.93% copper-equivalent is excellent in holes 63 and 66-67 both showed a very sizeable section of 12m of 2.97% copper-equivalent and 2.36% copper-equivalent respectively.”
Key topics discussed:
- A rearranged angle of the drillbit and found the primary zone full of metal.
- Retargeted drills at a lower pitch further west and once again found the main Lion Zone.
- 5m of 5.93% copper-equivalent in holes 63 and 66-67.
- Continuously increasing level of confidence about continuity of the zone.








