Scottie Resources (TSX-V:SCOT) has identified a potential new near-surface vein alongside further gold intersections at its Blueberry Contact Zone within the Scottie Gold Mine Project in British Columbia, Canada.
Hole SR26-491 returned 3.10m @ 17.20 grams per tonne gold (Au) from 11.20m downhole, including 1.10m @ 45.10g/t Au.
Scottie interprets the intersection and visual mineralisation in adjacent holes as defining an additional vein within the open-pit shell proposed in its 2025 preliminary economic assessment (PEA) but outside the current resource model.
At the Road 1 vein, SR26-503 intersected 1.60m @ 83.80g/t Au.
Hole SR26-526 returned 7m @ 23.10g/t Au at Blueberry 3, including 2.10m @ 72.90g/t Au. The same hole intersected 6m @ 23.10g/t Au at Blueberry 5.
At Fifi 2, SR26-532 returned 5.60m @ 20.60g/t Au, extending mineralisation below the PEA stope outlines. The vein remains open at depth.
Reported intervals are core lengths, with true widths yet to be established.
President and CEO Thomas Mumford says the results highlight further opportunities within the proposed mine plan.
“One of the most compelling aspects of the Blueberry Contact Zone is that we continue to uncover new opportunities within an already impressive high-grade gold system,” Mumford says.
Scottie has completed 61,578m across 227 holes during its largest drilling campaign to date. More than 85% of assays remain pending, with results expected through early 2027.
The company plans an updated mineral resource estimate and Feasibility Study during the first half of 2027. The update is expected to incorporate approximately 90,000m drilled since the initial estimate, which contains 703,000 inferred ounces.
The results build on earlier assays pointing to extended gold mineralisation at Blueberry.
Scottie Resources is a Canadian explorer holding approximately 58,500 hectares in British Columbia’s Stewart Mining Camp.
Write to France Pinzon at Mining.com.au
Main image: Scottie Resources



