Emerita Resources (TSX-V:EMO) has completed a Prefeasibility Study (PFS) for its Iberian Belt West Project in Spain, outlining an underground operation over a 21-year mine life.
The base case returns an after-tax net present value (NPV) of US$776 million ($1.1 billion) at an 8% discount rate and an internal rate of return (IRR) of 23.51%. Payback is 1.9 years from the start of production.
Meanwhile, initial capital is US$567 million, with sustaining capital of US$279.5 million.
Using September 2026 spot prices, the NPV rises to just more than US$1 billion and the IRR to 27.13%, with payback cut to one year and six months.
The mine plan relies on a maiden probable mineral reserve of 23.4 million tonnes (Mt) @ 2.3% zinc, 1.13% lead, 0.45% copper, 53.21 grams per tonne silver, and 1.07g/t gold. Plant throughput is 1.2Mt per annum.
An updated mineral resource estimate reports 26.1Mt indicated and 9.9Mt inferred.
A conventional flotation flowsheet will produce pyrite, zinc, lead, and copper concentrates. Pyrite concentrate, which accounts for about 66% of net smelter return, is not exchange-traded. The concentrate also depends on its gold, silver, and sulphur content.
The project hosts the La Romanera, El Cura, and La Infanta deposits, which remain open along strike and at depth.
The PFS outlines a robust base case while identifying areas for further optimisation, including mine sequencing and metallurgical work.
CEO Joaquin Merino says the study validates the project’s potential at this stage of development.
“The study demonstrates the technical and economic viability of developing IBW into a high-grade polymetallic underground mine in the Iberian Pyrite Belt at a prefeasibility level of study and identifies opportunities to further optimise IBW,” Merino notes.
Emerita Resources is a Canadian explorer advancing a portfolio of base and precious metals assets across Spain’s Iberian Pyrite Belt, including the Nuevo Tintillo Project.
Write to JC Villarba at Mining.com.au
Images: Emerita Resources