This article is a sponsored feature from Mining.com.au partner Burley Minerals. It is not financial advice. Talk to a registered financial expert before making investment decisions.
Mineral exploration is a tough business at the best of times. Finding and developing good (viable) mineral resources is difficult. When such discoveries are made in recognised mineral belts with established infrastructure and occupied by known producers, junior explorers tend to capitalise on the advantages of this ‘nearology’.
Burley Minerals (ASX:BUR) is fortunate to have held ‘good assets’ within its portfolio from inception and has garnered more since. The $10.07 million market capitalisation company has moved across several commodities and jurisdictions in the hunt for such assets in the past few years.
Speaking to Mining.com.au, CEO Stewart McCallion says Burley has maintained a lean and agile organisation, while developing a board of complementary skill sets with a ‘big picture’ strategy bolstered by the benefits of ‘nearology’.
“Our big picture strategy of garnering mineral assets adjacent to existing infrastructure has not changed. This has not only facilitated getting on the ground, but also in illustrating the potential of development and operations,” the CEO tells this news service.
Burley Minerals is seeking to capitalise on its Cane Bore Iron Project situated in a renowned mineral belt in the Pilbara region of Western Australia, which is adorned with longstanding infrastructure and is a hive of activity with established producers – all just 90km from coastal town Onslow.
Once defined, the company’s channel iron deposit (CID) may be the closest iron deposit to the Ashburton Port, which is a multi-user facility and strategic industrial area.
Known as ‘nearology’, McCallion says focusing where geological conditions have led to the formation of the known mineralisation means it also could be present nearby and is an advantage for the iron ore minnow.
Big picture, long history
Burley’s Cane Bore is located near majors such as Mineral Resources (ASX:MIN) and Rio Tinto (ASX:RIO), in a region in Western Australia that boasts infrastructure like power and water supply, roads and railway, as well as historical geological data.
Rio Tinto’s Robe Valley Operation is less than 80km from Onslow (in a straight line) and exports its ore through Wickham (Point Samson), more than 200km away, as this is seen as a preferred ‘natural port’. McCallion notes this means the port is along a deeper coast, something advantageous from a cost and logistics perspective as it does not require significant dredging of the seafloor to enable large shipping vessels to dock.
More recently, Mineral Resources (ASX:MIN) has been powering up Onslow Iron’s energy future with construction under way on a 3.8-megawatt solar array at its Ken’s Bore mine site, which is adjacent to Burley’s deposit. MinRes has started shipping out through Onslow.
MinRes has solved the dredging problem by using transshipping wherein it owns a storage facility on the coast to transfer ore into an in-between vessel – effectively a large barge that sails out to the actual shipping vessel moored offshore.
Burley’s CEO says MinRes has demonstrated that such a transshipping arrangement is economic but importantly the company’s focus in the region signals that “Onslow is now starting to warm up”.
“When we talk about nearology, what I’m trying to sum it up as is, one, geologically, there are large channel iron deposits in immediate proximity. You’ve got Robe Valley right up to the north. You got Ken’s Bore just to the northeast slightly,” McCallion tells this news service.
“Onslow has not enjoyed the iron ore boom like Karratha/Dampier, Roebourne/Wickham and Port Hedland have in the past 20 years. Until now, of course, as Mineral Resources has commenced shipping out of the Port of Ashburton just south of Onslow early this year.
“This is a significant step by MinRes as they are demonstrating the viability of transhipping on the WA coast, where there are limited natural ports, and importantly it will attract resources to Onslow, and improve infrastructure overall, facilitating mineral exploration and development in the local region.”
This not only has a positive effect on Cane Bore and its iron ore resource, but other companies searching for rare earths, lithium and/or base metals in the local region. As such, McCallion believes MinRes’s Onslow Project will be a catalyst for more exploration and development in the region for decades to come.
“What we’re saying is, look, this is grassroots exploration at Cane Bore. No one really has explored this area before, not since the 1960s. At that point, it was done at a very high level, wide space, some geologists remember, you can think about what it was like. It was a dirt track up there in the 1960s. The North West Coastal Highway was a goat track for goodness sake. Coral Bay was… the only people that went out there were farmers in the local area,” the CEO adds.
“The point being is that around it – and this is where the nearology comes in, around it, you’ve got Robe Valley to the north, which is about less than 100km north. That’s Rio Tinto’s channel iron deposits that’s been running for decades.”
“The point being is that around it – and this is where the nearology comes in, around it, you’ve got Robe Valley to the north, which is about less than 100km north”
Rio Tinto’s Robe Valley has access to other major mining infrastructure including an iron ore port facility at Cape Lambert, power assets, and heavy haul rail lines connecting its operations north up to Roebourne and out through Wickham and Point Samson.
In October 2022, the Robe River JV partners – Rio Tinto, Mitsui, and Nippon Steel, gathered in Perth to celebrate the 50-year anniversary of the venture’s first shipment of iron ore from the Pilbara to Japan.
The celebration marked half a century since the Fujisan Maru departed Cape Lambert on 5 October 1972, and set sail to Japan loaded with 68,589 tonnes of iron ore. Since then, the Robe River JV has shipped more than 1.7 billion tonnes of iron ore.
McCallion notes there’s still potentially 300 or 400 million tonnes to be mined, meaning in terms of nearology Burley is in the right address, adding that the Australian Premium Iron (API) West Pilbara joint venture is also nearby.
The West Pilbara Iron Ore Project is one of the largest independently owned undeveloped direct shipping iron ore projects in Australia, held by the API joint venture partners Aquila and AMCI(IO) (held jointly by AMCI and POSCO).

“Then you’ve also got the CZR Resources (ASX:CZR) Robe Mesa deposit, which is about 33 million tonnes of ore reserves at 55% Fe. CZR did a Feasibility Study on the Robe Mesa deposit last year about this time. Then in January of this year, said, ‘Oh, we’re going to sell it for a hundred million bucks’,” the CEO adds.
“Frankly, that was a catalyst for us to get the ball moving again, move out of lithium and say, ‘Well, let’s go back to iron ore because there’s obviously still a lot of interest’. There’s geological nearology.”
On 11 January, CZR Resources announced it had entered into a binding agreement to sell Zanthus Resources, a wholly owned subsidiary that controls an 85% interest in the Robe Mesa Iron Ore Project, to Miracle Iron Resources for $102 million.
The Robe Mesa deposit has an 89.6Mt mineral resource with an average Fe grade of 54.4% (61% Fe calcined) and includes a higher grade resource of 45.2Mt with an average grade of 56% (62.7% Fe calcined). The project has a 33Mt reserve on 60 hectares of ground just to the north of Burley’s Cane Bore Project.
CZR is expected to truck its ore some 170km to Onslow after building a 40km haul road as well as other infrastructure.
Comparatively, Burley’s geologists have been mapping and collecting rock chip samples over approximately 1,500 hectares of CID target areas.
As a simple comparison, CZR’s 60 hectares of landholding some 170km from Onslow equates to 4% of Burley’s total 1,500 hectares of CID target areas, meaning significant potential exists.
60 years of exploration
The Cane River area was historically explored for iron ore more than 60 years ago but only wide-spaced sampling of surface materials was reported.
More recent reconnaissance work, using recent satellite imagery, multi-spectral imagery, topographic data and extrapolation of known regional resources, indicates the potential to delineate more than 30 linear km of CID mineralisation.
“These channel iron deposits present several advantages – relatively easy resources to define and model; easy to mine with low strip ratios, low powder factors, high recovery, and low dilution,” Burley’s CEO says.
“Also, from a processing perspective, these ore bodies are easy to beneficiate through simple crush and screen operations. All these elements in addition to low transport costs contribute to low operating costs overall, which suggests the mines can withstand the lows of the commodity cycle and still be profitable.
“Burley’s market cap is hovering around $11 million, presenting an opportunity to invest at the grassroots level and enjoy share price appreciation as we deliver exploration success at Cane Bore.”
During the late 1960s when the Cane River area was initially being explored, now established mining hubs like Karratha and Dampier ‘hardly existed’. Some geologists went out there picking up samples at a very wide space and found iron ore on what was then a pastoral lease, which eventually became a Class C Reserve, says McCallion.
Burley’s exploration is using existing access tracks within this reserve, and has been minimising new clearing. Through biological surveys completed in 2023, the company has demonstrated there are no threatened or priority ecological communities in the target areas.

Surrounded by majors
This work is helping Burley in executing its ‘big picture’ strategy while seeking to capture the attention of nearby large miners. In essence, the company is ticking boxes at Cane Bore, located in the Pilbara less than 100km by sealed road from Onlsow and the Port of Ashburton.
Significant inroads are being made with engagement of the Traditional Land Owners as various permitting processes continue. Heritage Protection Agreements are in place with the PKKP Aboriginal Corporation and Buurabalayji Thalanyji Aboriginal Corporation and Burley pursuing cost estimates and schedules to complete heritage surveys.
The timing and costs for heritage surveys with TLOs groups is being confirmed.
In October, Burley started mapping and rock-chip sampling at the exploration licence area, adjacent to the sealed North West Coastal Highway, intersecting the Onslow Road. Rock-chip samples were submitted to the laboratory for assays and results are expected to be available in November 2024.
Exploration licence E08/3424 was granted by the Department of Energy, Mines, Industrial Regulation and Safety (DEMIRS) in September and a program of work for a maiden drilling program has been lodged with DEMIRS.
There has been some informal interest from nearby majors, however McCallion believes the catalyst for attracting formal approaches will be from demonstrating the Cane Bore resource with a degree of confidence.
“And again, there’s no shortage of geological understanding of these deposits,” the CEO adds.
Records of historic rock chip sampling by United States Steel International (New York) Incorporated (US Steel) from two field reconnaissance trips conducted in 1968 and 1969 at the Cane Bore area have revealed grades in upwards of 55% Fe; some 18 rock chip samples were collected over the 4 extent of the exploration licence, returning assay results between 45% and 54.3% Fe.
“Burley is in a very unique position in that it’s surrounded by majors, so you’re in the right address. You’ve got existing infrastructure, sealed roads, ports, the nearology aspect, obviously,” McCallion tells Mining.com.au.
“And so really, the only thing is it’s not a question of if, it’s a question of when, and that’s going to be determined by the exploration work we’re already doing, drilling the project and getting to an indicated resource. Basically it’s all there ready to go. Just watch this space.”
Write to Adam Orlando at Mining.com.au
Images: Burley & Rochelle Padua



