BP Silver (TSX-V:BPAG) will continue drilling at Jalsuri North after two step-out holes at its Cosuño Silver Project in Bolivia ended in mineralisation.
The company reports assays from holes CO-0016 and CO-0019, part of its phase-two diamond drilling program.
Hole CO-0019 returned 10m @ 183.62 grams per tonne silver (Ag) and 0.59g/t gold (Au) for 239.65g/t silver equivalent (AgEq) from 3m depth, including 2m @ 506.5g/t Ag and 1.08g/t Au.
The same hole cut 100m @ 2.49% zinc equivalent (ZnEq) and ended in mineralisation.
Hole CO-0016 returned 96m @ 1.37% zinc (Zn) for 1.91% ZnEq from 4m, with the final 2m averaging 4.18% Zn and 3.44g/t Ag.
The company interprets the mineralisation as the upper or distal levels of an intermediate-sulfidation epithermal system beside the Cosuño lithocap.
Director and Qualified Person Stewart Redwood notes the holes show “distinct metal zonation”, likely linked to temperature variations in the hydrothermal system.
The recent step-outs suggest the mineralised system remains open, supporting the company’s broader exploration strategy across the project.
CEO Tim Shearcroft says the results validate the company’s geological modelling for the area.
“These results reinforce our view that Jalsuri North may host a substantial polymetallic system with significant potential for further expansion,” Shearcroft adds.
True widths are not yet determined, and no metallurgical testwork has been completed at Cosuño.
BP Silver is a Canadian silver exploration company advancing a portfolio of projects in Bolivia’s prolific silver belt, including the earlier-stage Titiri Silver Project.
Write to JC Villarba at Mining.com.au
Images: BP Silver



